5 DPWH Bulacan Engineers Suspended Over P118-M Flood Control Projects
The Office of the Ombudsman ordered the preventive suspension of five engineers over alleged irregularities in three flood control projects in Bulacan.
The Office of the Ombudsman ordered the preventive suspension of five engineers over alleged irregularities in three flood control projects in Bulacan.